Clark County Reviews Silverado Resort Proposal for Enterprise Location
Quinn Krause · Aug 26, 2026

Clark County Reviews Silverado Resort Proposal for Enterprise Location

Local developer Michael Ochoa has filed plans with Clark County for a new hotel-casino resort named Silverado, and the submission covers a 13.5-acre parcel at the northwest corner of Las Vegas Boulevard and Richmar Avenue in the Enterprise area several miles south of the Las Vegas Strip near South Point. The filing outlines a two-phase development that begins with a 300-room hotel, a 57,000-square-foot casino floor, multiple food-and-beverage outlets, entertainment venues, conference facilities, and a five-level parking garage, while the second phase adds another 150 rooms across two six-story hotel buildings.
Site and Location Context
The property sits along Las Vegas Boulevard in an unincorporated section of Clark County that has seen steady commercial growth, and county records show the application includes conceptual site plans along with a staff report that details access routes, traffic circulation, and utility connections. Observers note the location places the project roughly a short drive from the South Point Hotel Casino and Resort, which already anchors gaming and entertainment options in the southern valley corridor.
Development Phases Outlined
Phase one centers on the core gaming and lodging components that include the 300-room hotel tower, the full casino square footage, dining and bar spaces, live entertainment areas, meeting rooms, and the multi-level garage designed to support both guests and staff vehicles. Phase two expands the room count by 150 units within the same two six-story structures, and the overall layout keeps both buildings at six stories to align with height restrictions and surrounding development patterns in the Enterprise planning area.

County processing of the application follows standard review steps that involve zoning verification, environmental assessments, and public hearings where nearby residents can submit comments on traffic, noise, and infrastructure impacts. The developer has provided preliminary drawings that show how the buildings will orient toward Las Vegas Boulevard while buffering service areas and parking from adjacent parcels.
Project Components in Detail
The casino floor spans 57,000 square feet and will house slot machines, table games, and supporting amenities, while food-and-beverage outlets range from casual dining to bars and lounges integrated throughout the property. Conference space allows for meetings and events separate from the main gaming areas, and entertainment venues include flexible rooms that can host performances or private functions. The five-level parking garage provides structured parking that reduces surface lot requirements and keeps the overall footprint contained within the 13.5-acre site.
Regulatory Path Ahead
Clark County planning staff will evaluate the submission against current zoning and master plan designations before the matter advances to the Planning Commission and ultimately the Board of County Commissioners for final action. The process includes opportunities for public input, and any conditions placed on approvals would address traffic mitigation, water usage, and design standards typical for projects of this scale in the Enterprise area.
Conclusion
The Silverado proposal represents a new standalone resort development outside the Las Vegas Strip core, and county records indicate the application remains under initial review as of the latest filings. Further steps will determine whether the project receives the necessary entitlements to proceed with construction of the first phase and the subsequent room expansion outlined in the two-building plan.